Demolition to Kitchen Remodel

Project Type

Kitchen Remodel

Timeline

20 Weeks

Location

Oldsmar, FL

PRoject Budget

$55,632

Description

The project began with a full demolition, followed by the installation of new drywall in areas where the previous tile backsplash had been removed.

New, full plywood construction kitchen cabinets were installed based on the simulated rendering. Cabinet features include:

  • Pull-out drawers in the base cabinets
  • A pull-out trashcan cabinet
  • Glass-front upper cabinets (where shown)
  • A full-height stacked pantry cabinet in place of the old bar area
  • Decorative crown molding and light rail

The new backsplash features Elida Ceramica Sparkling River Glass Mosaic tile, paired with LED under-cabinet lighting connected to the existing switches.